The battery storage project in Tangermünde, in the district of Stendal, has an output of 15.8 MW and a large storage capacity of 32 MWh. The battery storage system is used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and avoided network charges (§ 18 StromNEV) and is connected to the Avacon Netz GmbH network. The plant, which was completed and put into operation in 2025, was sold to Obton and is operated by them.