Tangermünde

Tangermünde

15.8 MW storage capacity
32 MWh storage capacity
Stendal district, Saxony-Anhalt
Realisiert
Im Bau
Baureife ereicht

The battery storage project in Tangermünde, in the district of Stendal, has an output of 15.8 MW and a large storage capacity of 32 MWh. The battery storage system is used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and avoided network charges (§ 18 StromNEV) and is connected to the Avacon Netz GmbH network. Construction of the plant is planned for 2025.