Project progress at a glance

Site secured
Project development
Building permit
Grid connection planning
Start of construction
Construction phase
Commissioning
Operation
Federal state

/ Technical concept

Storage power
Storage capacity
Battery containers
MVPS containers (Medium Voltage Power Station)
Operations building
/ Voices on the project

Bad Düben

13.8 MW storage power
15.2 MWh storage capacity
Nordsachsen district, Saxony
Realized
In construction
Ready for construction

The battery storage project in Bad Düben has an output of 13.8 MW and a large storage capacity of 15.2 MWh. Samsung SDI battery cells are used. The battery storage system is used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and avoided network charges (§ 18 StromNEV) and is connected to the network of the Mitteldeutsche Netzgesellschaft Strom mbH. The plant, which was completed and commissioned in 2022, was sold to Obton and is operated by them.