All projects

In operation
Neustadt-Bad Windsheim district, Bavaria

Fact sheet
Location
Neustadt-Bad Windsheim district, Bavaria
Power
Capacity
Status
Grid connection
Grid operator
Planned commissioning
Zur Pressemitteilung
/ Project status

Project progress at a glance

Site secured
Project development
Building permit
Grid connection planning
Start of construction
Construction phase
Commissioning
Operation
Federal state

/ Technical concept

Storage power
Storage capacity
Battery containers
MVPS containers (Medium Voltage Power Station)
HV transformer stations
/ Voices on the project

Diespeck

20.7 MW storage power
24 MWh storage capacity
Neustadt-Bad Windsheim district, Bavaria
Realized
In construction
Ready for construction

The battery storage project in Diespeck, in the Neustadt - Bad Windsheim district, has an output of 20.7 MW and a large storage capacity of 24 MWh. Samsung SDI battery cells are used. The battery storage system is used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and avoided network charges (§ 18 StromNEV) and is connected to the N-Ergie Netz GmbH network. The plant, which was completed and put into operation in 2022, was sold to VERBUND and is operated by them.