Husum Battery Storage

In construction
Nordfriesland district, Schleswig-Holstein

In Horstedt near Husum, Kyon Energy is building a large-scale battery storage system with an output of 146.5 MW and a storage capacity of 296 MWh. The battery storage system is one of the largest projects in the Kyon Energy portfolio. Commissioning is planned for 2027. Once in operation, the system is intended to flexibly absorb and store electrical energy and feed it back into the power system. This allows it to provide additional flexibility for balancing electricity generation and demand over time.

Fact sheet
Location
Nordfriesland district, Schleswig-Holstein
Power
146.5 MW
Capacity
296 MWh
Status
In construction
Grid connection
Husum Nord substation
Grid operator
Tennet GmbH
Planned commissioning
2027
Zur Pressemitteilung
/ Project status

Project progress at a glance

The Husum battery storage system is currently in the construction phase. The following milestones show the current progress of the project on its way to operation.

Site secured
Project development
Building permit
Grid connection planning
Start of construction
Construction phase
Commissioning
Operation
Federal state

Why the Husum site?

Its proximity to the Husum Nord substation gives the Horstedt site ideal conditions for operating a battery storage system. At the same time, the project is located in one of Germany's most important renewable energy regions. The combination of a high-performance grid connection and high regional power generation makes Husum a suitable location for flexible storage infrastructure. Once commissioned, the storage system will be used on various energy markets and will support the integration of renewable energies.

/ Technical concept

What size, components and technical key data characterize the project?

The Husum battery storage system has an output of 146.5 MW and a storage capacity of 296 MWh. The system is used flexibly on various electricity markets and can absorb or feed in energy within a very short time. This helps to stabilize the power system and supports the integration of renewable energies.

Like all Kyon Energy projects, Husum is planned and operated in line with current technical and safety standards. The system is fully remotely monitored and continuously checked to ensure safe and reliable operation.

146.5 MW
Storage power
296 MWh
Storage capacity
65
Battery containers
46
MVPS containers (Medium Voltage Power Station)
2
HV transformer stations
Batteries from the French sister company Saft
Designed for up to three charge and discharge cycles per day
/ Voices on the project

“The project shows what is possible when municipalities, companies and landowners work together in a spirit of trust from the very beginning. For Horstedt, it was important to actively help shape the energy transition while also taking the interests of our municipality into account. Our collaboration with Kyon Energy was consistently constructive and solution-oriented.”

Michael Hansen
Mayor of the municipality of Horstedt
Michael Hansen, Mayor of the municipality of Horstedt
Power pylon on a green field under a blue sky

Environment and site in focus

In building the Husum battery storage system, Kyon Energy relies on a construction method that uses as little land as possible. Screw pile foundations reduce ground intervention and permanent soil sealing. At the same time, this construction method allows the system to be largely dismantled. Combined with the comparatively small footprint of a battery storage system, this creates infrastructure that makes an important contribution to integrating renewable energies while supporting a resource-efficient use of land.

  • Land-saving construction with screw pile foundations
  • Reduced permanent soil sealing
  • Short cable routes thanks to a site directly at the substation
  • Environmental compatibility considered from the land-use planning stage
  • Compensation measures as part of the permit
  • Species protection surveys and environmental reports

Husum

146.5 MW storage power
296 MWh storage capacity
Nordfriesland district, Schleswig-Holstein
Realized
In construction
Ready for construction

The battery storage project in Husum, North Frisia district, has an output of 146.5 MW and a gross storage capacity of 296 MWh. The battery storage system is used to provide system services (in particular primary control power) and to generate revenue from optimization on the spot market and is connected to the Tennet GmbH network. Construction of the plant is planned for 2027.

‍

“The project shows what is possible when municipalities, companies and landowners work together in a spirit of trust from the very beginning. For Horstedt, it was important to actively help shape the energy transition while also taking the interests of our municipality into account. Our collaboration with Kyon Energy was consistently constructive and solution-oriented.”
Michael Hansen, Mayor of the municipality of Horstedt
Michael Hansen
Mayor of the municipality of Horstedt