All projects

In construction
Nienburg (Weser) district, Lower Saxony

Fact sheet
Location
Nienburg (Weser) district, Lower Saxony
Power
Capacity
Status
Grid connection
Grid operator
Planned commissioning
Zur Pressemitteilung
/ Project status

Project progress at a glance

Site secured
Project development
Building permit
Grid connection planning
Start of construction
Construction phase
Commissioning
Operation
Federal state

/ Technical concept

Storage power
Storage capacity
Battery containers
MVPS containers (Medium Voltage Power Station)
HV transformer stations
/ Voices on the project

Mehringen

146.5 MW storage power
296 MWh storage capacity
Nienburg (Weser) district, Lower Saxony
Realized
In construction
Ready for construction

The battery storage project in Mehringen, Nienburg district (Weser), has an output of 146.5 MW and a gross storage capacity of 296 MWh. The battery storage system is used to provide system services (in particular primary control power) and to generate revenue from optimization on the spot market and is connected to the Tennet GmbH network. Construction of the plant is planned for 2027.

‍