Project progress at a glance

Site secured
Project development
Building permit
Grid connection planning
Start of construction
Construction phase
Commissioning
Operation
Federal state

/ Technical concept

Storage power
Storage capacity
Battery containers
MVPS containers (Medium Voltage Power Station)
HV transformer stations
/ Voices on the project

Weener

20.7 MW storage power
52 MWh storage capacity
Leer (Ems) district, Lower Saxony
Realized
In construction
Ready for construction

The battery storage project in Weener, in the district of Leer (Ems), has an output of 20.7 MW and a gross storage capacity of 52 MWh. The battery storage system is used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and from avoided network charges (§ 18 StromNEV) and is connected to the EWE Netz GmbH network.

‍